Warning: Use of undefined constant replace_meta_widget - assumed 'replace_meta_widget' (this will throw an Error in a future version of PHP) in /homepages/40/d356269628/htdocs/2017/wp-content/plugins/customize-meta-widget/customize-meta-widget.php on line 21
Draft Plan and Draft Spreadsheets – Hoover Power Allocation Post-2017 at 2017 Allocation Process

Draft Plan and Draft Spreadsheets – Hoover Power Allocation Post-2017

Attached are the corrected draft spreadsheets for Alternatives 1 through 3 for Schedules D2/A and D2/B Power revised subsequent to the Consultants’ Workshop of January 16, 2015.

Alt 1-3 D2A and B Corrections 01.15.15


Warning: count(): Parameter must be an array or an object that implements Countable in /homepages/40/d356269628/htdocs/2017/wp-includes/class-wp-comment-query.php on line 399